DID YOU KNOW?
There will be no active Ascon Final Remedy excavation or grading work on Monday, February 23, or Tuesday, February 24, to allow the Site to dry from the recent rain events in the area. Excavation and grading work may resume onsite this week, dependent on weather and Site conditions.
If you have any questions, please call the Ascon information line at 714-388-1825 or send an email to info@asconhb.com.
SITEWIDE ACTIVITIES
FIELD WORK: Excavation work may continue in the western, northern, eastern and central areas of Ascon this week, depending on weather and Site conditions.
An offsite odor monitoring technician, in an Ascon-labeled orange safety vest, monitors outside the Site on days of onsite excavation in areas with a higher potential for odor. To answer community questions, the Ascon information table will be set up in Edison Park across from the Site on days of active excavation in areas with a higher potential for odor.
During this phase of work, personnel may be onsite on Saturdays to conduct Site work and equipment maintenance from 7 a.m. to 5 p.m.
Magnolia Street Storm Drain Connection Work
Infrastructure work to connect to the City’s storm drain that is located on the western side of Magnolia Street outside of the Site will be paused this week due to recent weather events in the area.
INSPECTIONS:
- DTSC is the lead regulatory agency for the Ascon project and conducts inspections at Ascon. Their inspection reports can be found on the online DTSC database, Envirostor.
- The City of Huntington Beach continues its regular stormwater inspections of Ascon. The latest inspection occurred on February 17. Site staff will be at Ascon daily during extended rain events (except holidays and weekends) to monitor the Site stormwater controls currently in place. Ascon remains in compliance with stormwater pollution prevention requirements.
- Regular inspections are conducted by Orange County Mosquito and Vector Control District (OCMVCD) in areas of the Ascon Site where water may be detained. Active mitigation measures are implemented by OCMVCD to protect the community, as well as onsite workers, from mosquitoes.
SECURITY: 24-hour, 7 days per week, onsite security continues during construction activities. Security is not always visible at the entrance gates. Unannounced visitors without official business or agency oversight of Ascon are not permitted to enter the Site. Trespassers will be reported to the Huntington Beach Police Department and DTSC.
You may see: You may see flashlights or headlights from vehicles after dark concluding daily activities and providing security at the 38-acre Site.
In an emergency: If you see or hear something that appears urgent, please call the Huntington Beach Police Department at 911 first, then the Ascon community information line, 714-388-1825. Calls to the Ascon information line are automatically logged and relayed by text and email to the Ascon team.
AIR MONITORING
Dust and total VOC monitoring is conducted 24/7 at upwind and downwind stations on the Ascon Site documenting effective dust control measures. This is in addition to 24/7 air monitoring at the neighborhood stations.
Where to find air monitoring data and live stream weather: Sitewide and live streaming weather conditions from the Ascon Site are found on the Actively Monitoring Air Quality page on asconhb.com. To view archived air monitoring results posted by DTSC on Envirostor – including weekly field inspections by DTSC that include air monitoring observations – click on “Community Involvement Documents” and scroll to “Updates and Information.”
| SAFETY MESSAGE |
|---|
SEE SOMETHING? HAVE A QUESTION? Call our information line: 714-388-1825 or email us at info@asconhb.com
DRONES: Drone flights over Ascon can create worker and Site safety issues. Please don’t fly drones over sensitive onsite equipment and the power lines along the perimeter of Ascon. We appreciate the community’s assistance.
ENTRANCE AND EXIT GATES: Entering the Ascon Site is prohibited to those who are not authorized. The community is asked to keep a safe distance from both entrance and exit gates at Ascon, especially during soil importing, and refrain from parking, walking, or standing in these areas. The gates on Magnolia Street and Hamilton Avenue may open unexpectedly for workers and site inspections, as well as supply delivery and removal.
PEDESTRIANS: Your safety is important! Pedestrians have been observed walking next to Ascon along Magnolia and Hamilton streets (adjacent to the concrete fence base where there currently is no sidewalk). We encourage pedestrians to observe public pathway signage and use the sidewalks on the east side of Magnolia and the north side of Hamilton.
Have a Question or Concern?
Please contact the Ascon community information line at 714-388-1825 or email info@asconhb.com. If there is a potential emergency, please call 911. Sign up for AsconAlert, an opt-in community alert system for the Ascon project here.
Stay Informed
Please subscribe for email updates.
Information provided through this website may be shared with the Ascon team, Ascon consultants, Ascon responsible parties and government agencies. Read our Privacy Policy.