DID YOU KNOW?
The third Southeast Area Huntington Beach Committee meeting of 2026 will take place this Wednesday, May 27, at 4:30 p.m. The committee will update the community on major projects in and near southeast Huntington Beach, including Ascon. The meeting will be held in person at the Civic Center in the Lower Level in Room B7/B8.
To be added to the email list to receive agendas, send your request to sandie.frakes@surfcity-hb.org.
SITEWIDE ACTIVITIES
FIELD WORK: There will be no Ascon Final Remedy grading or clean soil import work today (May 25) or tomorrow (May 26) due to the Memorial Day holiday. Clean soil import and grading is scheduled to resume on Wednesday, May 27. Personnel may still be onsite to perform Site and equipment maintenance, as needed.
During this phase of work, personnel may also be onsite on Saturdays to conduct Site work and equipment maintenance from 7 a.m. to 5 p.m.
Clean Soil Import Work
Clean soil import is expected to resume this week, depending on availability.
Here is what you can expect to see:
- As many as 150 soil import trucks may arrive onsite each day.
- Work may occur Monday through Friday, between 7 a.m. and 6 p.m.
- Haul trucks enter Ascon from Hamilton Avenue and exit on Magnolia Street. Import haul trucks avoid the major intersection of Hamilton Ave. and Magnolia St. per the project’s approved haul route plan.
- Dust mitigation and traffic control measures are in place. We also conduct additional street cleaning outside the project Site entrance and exit areas during periods of import.
INSPECTIONS:
- DTSC is the lead regulatory agency for the Ascon project and conducts inspections at Ascon. Their inspection reports can be found on the online DTSC database, Envirostor.
- The City of Huntington Beach continues its regular stormwater inspections of Ascon. Site staff will be at Ascon weekly for routine inspections and daily during extended rain events as needed to monitor the Site stormwater controls. Ascon remains in compliance with stormwater pollution prevention requirements.
- Regular inspections are conducted by Orange County Mosquito and Vector Control District (OCMVCD) in areas of the Ascon Site where water may be detained. Active mitigation measures are implemented by OCMVCD to protect the community, as well as onsite workers, from mosquitoes.
SECURITY: 24-hour, 7 days per week, onsite security continues during construction activities. Security is not always visible at the entrance gates. Unannounced visitors without official business or agency oversight of Ascon are not permitted to enter the Site. Trespassers will be reported to the Huntington Beach Police Department and DTSC.
You may see: Flashlights or headlights from vehicles after dark concluding daily activities and providing security at the 38-acre Site.
AIR MONITORING
Dust and total VOC monitoring is conducted 24/7 at upwind and downwind stations on the Ascon Site, documenting effective dust control measures.
Where to find air monitoring data: To view archived air monitoring results posted by DTSC on Envirostor – including weekly field inspections by DTSC that include air monitoring observations – click on “Community Involvement Documents” and scroll to “Updates and Information.” Air monitoring data are also available on asconhb.com
| SAFETY MESSAGE |
|---|
SEE SOMETHING? HAVE A QUESTION? Call our information line: 714-388-1825 or email us at info@asconhb.com
DRONES: Drone flights over Ascon can create worker and Site safety issues. Please don’t fly drones over sensitive onsite equipment and the power lines along the perimeter of Ascon. We appreciate the community’s assistance.
ENTRANCE AND EXIT GATES: Entering the Ascon Site is prohibited to those who are not authorized. The community is asked to keep a safe distance from both entrance and exit gates at Ascon, especially during soil importing, and refrain from parking, walking, or standing in these areas. The gates on Magnolia Street and Hamilton Avenue may open unexpectedly for workers and site inspections, as well as supply delivery and removal.
PEDESTRIANS: Your safety is important! Pedestrians have been observed walking next to Ascon along Magnolia and Hamilton streets (adjacent to the concrete fence base where there currently is no sidewalk). We encourage pedestrians to observe public pathway signage and use the sidewalks on the east side of Magnolia and the north side of Hamilton.
Have a Question or Concern?
Please contact the Ascon community information line at 714-388-1825 or email info@asconhb.com. If there is a potential emergency, please call 911. Sign up for AsconAlert, an opt-in community alert system for the Ascon project here.