DID YOU KNOW?
Near real-time telemetry air monitoring results can be viewed at asconhb.com/restart. Telemetry-based air monitors around the Site perimeter report air monitoring data in near real time during work hours (7 a.m. to 6 p.m., Monday – Friday).
Ascon’s air quality monitoring data since 2019 has consistently shown air quality has been safely below health-protective screening levels, including during active work. To learn more about Ascon’s air monitoring approach during Final Remedy work, please visit asconhb.com/restart or check out our Restart Work Explainer.
SITEWIDE ACTIVITIES
FIELD WORK: Beginning Tuesday, 11/12, excavation and grading work is scheduled to begin in areas of lower odor potential in the southern area of the Site. Work crews are also scheduled to be working in the northeastern area to complete the 16-foot barrier wall at the corner of Magnolia Street and Hamilton Avenue in December.
The Ascon information table will be set up in Edison Park for the first week of work to answer community questions. An air monitoring technician, in an Ascon labeled orange safety vest, will be monitoring outside the Site during active excavation work. Offsite air monitoring trailers have been placed in the community to the east of the Site, in Edison Park, and near Eader Elementary and Edison High Schools.
INSPECTIONS:
- DTSC is the lead regulatory agency for the Ascon project and conducts inspections at Ascon. Their inspection reports can be found on the online DTSC database, Envirostor.
- The City of Huntington Beach continues its regular stormwater inspections of Ascon. Ascon remains in compliance with stormwater pollution prevention requirements.
- Regular inspections are conducted by Orange County Mosquito and Vector Control District of the onsite detention basins and other areas of the Ascon Site where water may be detained. Active mitigation measures are implemented by Vector Control to protect the community, as well as onsite workers, from mosquitoes with the goal of preventing vector-borne diseases.
SECURITY: 24-hour, 7 days per week, onsite security continues during construction activities. Security is not always visible at the entrance gates. Unannounced visitors without official business or agency oversight of Ascon are not permitted to enter the Site. Trespassers will be reported to the Huntington Beach Police Department and DTSC.
You may see: You may see flashlights or headlights from vehicles after dark concluding daily activities and providing security at the 38-acre Site.
In an emergency: If you see or hear something that appears urgent, please call the Huntington Beach Police Department at 911 first, then the Ascon community information line, 714-388-1825. Calls to the Ascon information line are automatically logged and relayed by text and email to the Ascon team.
AIR MONITORING
Dust and total VOC monitoring is conducted 24/7 at upwind and downwind stations on the Ascon Site documenting effective dust control measures. This is in addition to 24/7 air monitoring at the neighborhood stations when earthwork resumes on Tuesday.
Where to find air monitoring data and live stream weather: Sitewide and live streaming weather conditions from the Ascon site are found on the Actively Monitoring Air Quality page on asconhb.com. During no active earthwork, total VOCs and dust data have been posted weekly. Offsite monitoring begins again this week. To view archived air monitoring results posted by DTSC on Envirostor. — including weekly field inspections by DTSC that include air monitoring observations — click on “Community Involvement Documents” and scroll to “Updates and Information.”
SAFETY MESSAGE |
---|
SEE SOMETHING? HAVE A QUESTION? Call our information line: 714-388-1825 or email us at [email protected]
DRONES: Drone flights over Ascon can create worker and Site safety issues. Please don’t fly drones over sensitive onsite equipment and the power lines along the perimeter of Ascon. We appreciate the community’s assistance.
ENTRANCE AND EXIT GATES: Entering the Ascon site is prohibited to those who are not authorized. The community is asked to keep a safe distance from both entrance and exit gates at Ascon, and refrain from parking, walking, or standing in these areas. The gates on Magnolia Street and Hamilton Avenue may open unexpectedly for workers and site inspections, as well as supply delivery and removal.
PEDESTRIANS: Your safety is important! Pedestrians have been observed walking next to Ascon along Magnolia and Hamilton streets (adjacent to the concrete fence base where there currently is no sidewalk). We encourage pedestrians to observe public pathway signage and use the sidewalks on the east side of Magnolia and the north side of Hamilton.
Have a Question or Concern?
Please contact the Ascon community information line at 714-388-1825 or email [email protected]. If there is a potential emergency, please call 911. Sign up for AsconAlert, an opt-in community alert system for the Ascon project here.
Stay Informed
Please subscribe for email updates.
Information provided through this website may be shared with the Ascon team, Ascon consultants, Ascon responsible parties and government agencies. Read our Privacy Policy.