DID YOU KNOW?
Daily and seasonal rainfall totals and current weather data is shown on the Ascon website. The first number next to “rain” is the daily total (since midnight), and the seasonal total reflects the calendar year-to-date.
In accordance with Santa Ana Regional Water Quality Control Board requirements and the Ascon Stormwater Pollution Prevention Plan (SWPPP), field samples are collected each day during SWPPP-qualifying storm events when stormwater flows off the Site. Historical stormwater monitoring and sampling results have been below SWRCB-established screening levels. This documents that stormwater management is effective in preventing sediment and potential contaminants from leaving the Site. Learn more in our stormwater management explainer.
SITEWIDE ACTIVITIES
PROJECT STATUS: DTSC and the Ascon team are currently discussing pilot test workplans which will help determine the next steps toward completion of the cleanup. It is anticipated that the pilot testing phase will begin in 2023—pending DTSC approval of the workplans and receipt of required air permits from SCAQMD—following public notification and a DTSC-hosted community meeting.
MAINTENANCE: Regular maintenance is conducted within the Site and around the perimeter fence areas, including gate areas.
INSPECTIONS:
- DTSC is the lead regulatory agency for the Ascon project and conducts regular inspections at Ascon and independent air monitoring checks in nearby neighborhoods. Their inspection reports can be found on the online DTSC database, Envirostor.
- The City of Huntington Beach continues its regular stormwater inspections of Ascon. Ascon remains in compliance with stormwater pollution prevention requirements.
- Regular inspections are conducted by Orange County Vector Control of the onsite detention basins and other areas of the Ascon site where water may be detained. Active mitigation measures by Vector Control are protective of the community, as well as onsite workers, to prevent mosquitoes.
SECURITY: 24-hour onsite security continues. Security is not always visible at the entrance gates. In addition to 24/7 onsite security, there are regular visits by air quality technicians, Site inspectors, and Site maintenance personnel. Unannounced visitors without official business or agency oversight of Ascon are not permitted to enter the Site. Trespassers will be reported to the Huntington Beach Police Department and DTSC.
You may see: You may see flashlights or headlights from a limited number of vehicles at night conducting inspections and providing security at the 38-acre Site.
In an emergency: If you see or hear something that appears urgent, please call the Huntington Beach Police Department at 911 first, then the Ascon community information line, 714-388-1825. Calls to the Ascon information line are automatically logged and relayed by text and email to the Ascon team.
NEARBY ACTIVITIES:
- There are automobile storage activities that may generate noise or dust unrelated to Ascon at the former tank farm property, south of Ascon and adjacent to Magnolia Street.
- Orange County Public Works has planned work on the Sheet Pile Repair Project in the Huntington Beach Channel, south and southwest of Ascon, and the Talbert Channel, east of Ascon, which is expected to be an intermittent activity over the next two years.
AIR MONITORING
Air monitoring continues 24/7 both on the Ascon Site and at community locations, which includes dust data at upwind and downwind stations on the Ascon Site documenting effective dust control measures.
Where to find 24/7 air monitoring data and live stream weather: Sitewide and neighborhood air monitoring data and live streaming weather conditions from the Ascon site are found on the Actively Monitoring Air Quality page on asconhb.com. Analytical data are first analyzed by a certified outside laboratory, then validated, and then submitted to DTSC and shared on their online document database, Envirostor. To view archived air monitoring results posted by DTSC on Envirostor — including weekly field inspections by DTSC that include air monitoring observations — click on “Community Involvement Documents” and scroll to “Updates and Information.”
SAFETY MESSAGE |
---|
SEE SOMETHING? HAVE A QUESTION? Call our information line: 714-388-1825 or email us at [email protected]
DRONES: Drone flights over Ascon can create worker and Site safety issues. Please don’t fly drones over sensitive onsite equipment and the power lines along the perimeter of Ascon. We appreciate the community’s assistance.
ENTRANCE AND EXIT GATES: Entering the Ascon site is prohibited to those who are not authorized. The community is asked to keep a safe distance from both entrance and exit gates at Ascon, and refrain from parking, walking, or standing in these areas. The gates on Magnolia Street and Hamilton Avenue may open unexpectedly for workers conducting air monitoring and site inspections, as well as supply delivery and removal.
PEDESTRIANS: Your safety is important! Pedestrians have been observed walking next to Ascon along Magnolia and Hamilton streets (adjacent to the concrete fence base where there currently is no sidewalk). We encourage pedestrians to observe public pathway signage and use the sidewalks on the east side of Magnolia and the north side of Hamilton.
Have a Question or Concern?
Please contact the Ascon community information line at 714-388-1825 or email [email protected]. If there is a potential emergency, please call 911. Sign up for AsconAlert, an opt-in community alert system for the Ascon project here.
Stay Informed
Please subscribe for email updates.
Information provided through this website may be shared with the Ascon team, Ascon consultants, Ascon responsible parties and government agencies. Read our Privacy Policy.